UDC
656.25

STATE ESTIMATION OF RAILWAY AUTOMATION AND REMOTE CONTROL INFRASTRUCTURE OF UZBEKISTAN FOR INTRODUCTION OF HIGH-SPEED RUNNING State estimation of railway automation and remote control infrastructure of Uzbekistan for introduction of high-speed running

Published in Transport automation research · Pages 251–270 · Rubric: Automation and Remote Control Systems and Devices
Received: 12.09.2015 Accepted: 15.09.2015 Published: 25.09.2015 Language of publication: RUS
The article analyzes the state of railway automation and remote control infrastructure of Uzbekistan to introduce the high-speed running. It covers the infrastructure of high-speed line Tashkent - Samarkand, the necessity to modernize station and block systems, and centralized traffic control on this line. The article provides the forecast of passenger traf fi c with implementing of high-speed running, and the characteristics of railway automation and remote control systems of open lines, stations, and centralized traf fi c control. It presents the strategy for technical infrastructure for the construction of a new high-speed lines.
railway automation and remote control, high-speed running, high-speed traffic, interlocking, semi-automatic blocking, automatic blocking, centralized traffic control